1-excavation

1. Excavation

We dig out the area to correct depth and dispose of soil. Prepare and install necessary drainage.

2-edge-course

2. Edge Course

The edge restraint is laid on a sturdy concrete foundation around the perimeter.

3-lining-the-base

3. Lining The Base

A thick geotextile membrane is laid on the soil base to prevent the sub base mixing with the underlying layers. It can also help prevent weed growth.

4-sub-base

4. Sub Base

We supply and lay a suitable hardcore to give a solid base for the driveway.

5-laying-course

5. Laying Course

We then spread , level and compact laying course sand and screed to correct level.

6-block-laying

6. Block Laying

Paving blocks are then laid in the customers choice of colour and pattern.

7-cut-and-fill

7. Cut & Fill

Next we measure and cut the final blocks to size and fill the joints.

8-jointing-and-compaction

8. Jointing & Compaction

Kiln-dried jointing sand is spread over the block surface and swept into the joints using a soft brush and then compacted with a wacker plate.

9-completion

9. Completion

Excess jointing sand can be swept off the surface and it is now ready to be used.